UCC Pilot Plant

Yancoal Australia Pty Ltd's wholly owned subsidiary, UCC Energy Pty Ltd, owns and operates a pilot plant at Cessnock in the Hunter Valley, New South Wales. The nominal 350  kg/h facility was built in 2001-02 and upgraded in 2007-08. Some $45 million invested in UCC research and development to date has been funded by UCC Energy Pty Ltd and Australian Government grants.

The pilot plant is operated for 24 hour/day operation,  4 days/week. The plant is well suited to producing large quantities of UCC from different coal feeds as required. The plant is also used for process development work with the twin aims of improved economics and reduced carbon footprint.

UCC produced in the pilot plant has been sent to Japan for evaluation. Test results indicate UCC is suitable for efficient gas turbine combustion.

Photo Gallery

Plant interior 1
Show next gallery image (requires Javascript) Show previous gallery image (requires Javascript)
Plant interior 1
    Slide thumbnails to the left (requires Javascript)
    Slide thumbnails to the right (requires Javascript)

    Contact Us | Copyright © 2010 Yancoal Australia Ltd.